Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BEL LIDO DRIVE ' (1) ·
'BROWNS FARM/CR-827' (1) ·
'Gateway Blvd. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'LA MANCHA AVE. ' (1) ·
'Lantana Road ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'PALMWOOD ROAD ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'Tymber Creek Road ' (1) ·
'US-1 NB ' (1) ·
I-95 (1)
700059 (1) ·
700134 (1) ·
700222 (1) ·
790087 (1) ·
794194 (1) ·
890117 (1) ·
890118 (1) ·
930450 (1) ·
934136 (1) ·
934363 (1) ·
934365 (1) ·
934518 (1) ·
935900 (1) ·
937356 (1)
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2 Miles North of SR 40 ' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'200ft. W of A1A ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'US-1 NB - FECRR ' (1) ·
I-95 over Wickham Road (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)