Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 CANAL ' (1) ·
'I 95 and SR 704 ' (1) ·
'I 95 SR 9 ' (1) ·
'Indian River ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 N/S TPK ' (1)
'Belvede to NB I-95' (1) ·
'Clint Moore Road ' (1) ·
'Congress Avenue ' (1) ·
'CR-880 ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'WB SR704 to SB I95' (1)
700061 (1) ·
700137 (1) ·
930202 (1) ·
930459 (1) ·
930469 (1) ·
930485 (1) ·
930493 (1) ·
930494 (1) ·
930525 (1) ·
930527 (1) ·
930528 (1) ·
930940 (1) ·
931011 (1)
'0.1MI W of US-98 / SR-441' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'2 miles west of Turnpike ' (1) ·
'Between SR704 and 12th St' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'SW quadrant PB Int Airprt' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
122864 (1) ·
125788 (1) ·
12666 (1) ·
137065 (1) ·
17280 (1) ·
19952 (1) ·
23422 (1) ·
23596 (1) ·
33486 (1) ·
40772 (1) ·
41640 (1) ·
43375 (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)