Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Kind 043a:
Prestressed concrete continuous
& Inspect Date 090:
08-17
& Scour 113:
Other
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'IWW Halifax River ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Okeechobee Waterway ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'Turkey Creek ' (1)
700203 (1) ·
790174 (1) ·
790175 (1) ·
894062 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)