Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Berrys Canal ' (1) ·
'C-23 CANAL ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Header Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'North Relief Canal ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 N/S TPK ' (1) ·
'US-1 & FECRR ' (1)
790128 (1) ·
790149 (1) ·
884082 (1) ·
890110 (1) ·
890111 (1) ·
930412 (1) ·
930447 (1) ·
931011 (1) ·
934908 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940119 (1) ·
940162 (1) ·
940163 (1)
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'56th Place North ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-710 TPK Interchange ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)