Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Dirksen Drive ' (1) ·
'FECRR ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'KRUEGER CREEK ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'Lateral A Canal ' (1) ·
'M CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Padgett Creek ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'33rd Street ' (1) ·
'Benoist Farms Rd ' (1) ·
'Congress Avenue ' (1) ·
'CR-630 (41st St.) ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'EAST OCEAN AVE. ' (1) ·
'EB SR 786 ' (1) ·
'EB SR808 Glades Rd' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-4 WB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-714 ' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR808 Glades Rd' (1)
700012 (1) ·
790042 (1) ·
790941 (1) ·
884100 (1) ·
884104 (1) ·
890120 (1) ·
890121 (1) ·
890122 (1) ·
890159 (1) ·
930005 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930334 (1) ·
930491 (1) ·
930528 (1) ·
934151 (1) ·
934347 (1) ·
934711 (1)
'0.2MI WEST OF OF A1A ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1st overpass east of I-95' (1) ·
'2MI E of SR-76 ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'800 ft West of I 95 ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Boca Raton ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'Turnpike at Stuart exit. ' (1) ·
'US-1 - FECRR ' (1)
26203900 (1) ·
26210275 (1) ·
26220525 (1) ·
26220535 (1) ·
26220625 (1) ·
26350275 (1) ·
26371314 (1) ·
26404400 (1) ·
26424967 (1) ·
26455392 (1) ·
26503600 (1) ·
26564568 (1) ·
27072925 (1) ·
27073032 (1) ·
27094100 (1) ·
27115100 (1) ·
27391280 (1) ·
27400430 (1) ·
28370979 (1) ·
28520804 (1) ·
28521781 (1)
80023162 (1) ·
80050018 (1) ·
80050482 (1) ·
80054600 (1) ·
80070410 (1) ·
80070450 (1) ·
80070535 (1) ·
80070620 (1) ·
80070650 (1) ·
80071550 (1) ·
80101893 (1) ·
80102700 (1) ·
80135670 (1) ·
80164549 (1) ·
80164845 (1) ·
80181600 (1) ·
80182538 (1) ·
80274510 (1) ·
80274650 (1) ·
80483851 (1) ·
81170430 (1) ·
81171026 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.