Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL E-4 ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'L-30 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'Pine Street ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR 70 ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'CONGRESS AVE NB ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'Lake Worth Road ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR-407 ' (1) ·
'SR-472 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'St. Johns Heritage' (1)
700087 (1) ·
700091 (1) ·
700197 (1) ·
700198 (1) ·
704190 (1) ·
790190 (1) ·
930401 (1) ·
930456 (1) ·
931003 (1) ·
931004 (1) ·
934930 (1) ·
934933 (1) ·
934937 (1) ·
935308 (1) ·
940134 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'2.9 Miles South of US-192' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)