Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL E-4 ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'Dirksen Drive ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-30 CANAL ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'M CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Padgett Creek ' (1) ·
'Pine Street ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR 70 ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1)
'33rd Street ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-630 (41st St.) ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'EB SR808 Glades Rd' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'I-4 WB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SEMINOLE/PRATTWHT.' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR-407 ' (1) ·
'SR-472 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-714 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'St. Johns Heritage' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR808 Glades Rd' (1)
700087 (1) ·
700091 (1) ·
700197 (1) ·
700198 (1) ·
704190 (1) ·
790042 (1) ·
790190 (1) ·
790941 (1) ·
884100 (1) ·
884104 (1) ·
890121 (1) ·
890122 (1) ·
890159 (1) ·
930005 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
931003 (1) ·
934151 (1) ·
934347 (1) ·
934930 (1) ·
934933 (1) ·
934937 (1) ·
935308 (1) ·
940134 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'2.9 Miles South of US-192' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'4MI N OF OKEECHOBEE BLVD.' (1) ·
'800 ft West of I 95 ' (1) ·
'80ft. East of 66th Ave. ' (1) ·
'At CR-615 (66th Avenue) ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Turnpike at Stuart exit. ' (1)
26220525 (1) ·
26220535 (1) ·
26220625 (1) ·
26280864 (1) ·
26290167 (1) ·
26290244 (1) ·
26324784 (1) ·
26350275 (1) ·
26352544 (1) ·
26455392 (1) ·
26564568 (1) ·
27072925 (1) ·
27073032 (1) ·
27094100 (1) ·
27244449 (1) ·
27391280 (1) ·
27400430 (1) ·
28024500 (1) ·
28244169 (1) ·
28244206 (1) ·
28244249 (1) ·
28300578 (1) ·
28520804 (1) ·
28521781 (1) ·
28571929 (1)
80023162 (1) ·
80050482 (1) ·
80050886 (1) ·
80052317 (1) ·
80053541 (1) ·
80070620 (1) ·
80070650 (1) ·
80071550 (1) ·
80072101 (1) ·
80102433 (1) ·
80164549 (1) ·
80164845 (1) ·
80181600 (1) ·
80182538 (1) ·
80240727 (1) ·
80274510 (1) ·
80274650 (1) ·
80448000 (1) ·
80491330 (1) ·
80491332 (1) ·
80493553 (1) ·
80501889 (1) ·
81152767 (1) ·
81170430 (1) ·
81171026 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.