Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-4 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'L-30 CANAL ' (1) ·
'Lateral H Canal ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'Military Trail & CSX RR ' (1) ·
'N Fork Loxahatchee River' (1) ·
'Pine Street ' (1) ·
'Reed Canal ' (1) ·
'SR-404 ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'US-192 ' (1) ·
'WILLOUGHBY CREEK ' (1) ·
Addison Canal (1) ·
Wickham Road (1)
'53rd Street ' (1) ·
'Haverhill Rd ' (1) ·
'I-95 ' (1) ·
'INDIAN STREET ' (1) ·
'Lantern Park Drive' (1) ·
'MILITARY TRAIL SB ' (1) ·
'MINER RD. ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'SR A1A ' (1) ·
'SR-528 EB ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 SB ' (1) ·
'WB SR808 Glades Rd' (1) ·
I-95 (1)
700075 (1) ·
700151 (1) ·
700209 (1) ·
700222 (1) ·
700229 (1) ·
796549 (1) ·
884083 (1) ·
894040 (1) ·
930245 (1) ·
934148 (1) ·
934149 (1) ·
934359 (1) ·
934925 (1) ·
934926 (1) ·
934936 (1) ·
934942 (1) ·
936776 (1) ·
940158 (1)
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.7MI E of DIXIE HWY A1A ' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.6 Miles East of 58th Av' (1) ·
'800 ft West of I 95 ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'I-95 over US-192 ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'US-1 SB - SR-404 ' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.