Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-3 Canal ' (1) ·
'C-51 Canal ' (1) ·
'CYPRESS CREEK ' (1) ·
'E-1 CANAL ' (1) ·
'E3-canal ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'KELLER CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SHAWANO DRAINAGE DITCH ' (1)
'BELVEDERE ROAD ' (1) ·
'Benoist Farms Rd ' (1) ·
'BROWNS FARM/CR-827' (1) ·
'CENTER DRIVE ' (1) ·
'CONGRESS AVE NB ' (1) ·
'DUDA ROAD ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'Haverhill Rd ' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (SB) ' (1) ·
'Lake Ida Road ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'Melaleuca Lane ' (1) ·
'N CENTRAL PARK BLV' (1) ·
'PALMWOOD ROAD ' (1) ·
'PALOMINO DRIVE ' (1) ·
'PIPER'S GLEN ROAD ' (1)
934136 (1) ·
934271 (1) ·
934273 (1) ·
934282 (1) ·
934297 (1) ·
934328 (1) ·
934347 (1) ·
934357 (1) ·
934359 (1) ·
934360 (1) ·
934361 (1) ·
934518 (1) ·
934519 (1) ·
934711 (1) ·
934922 (1) ·
934923 (1) ·
934930 (1) ·
934940 (1) ·
934963 (1)
'0.1MI N of DONALD ROSS RD' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.6MI N OF PLMTTO PARK RD' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI N OF LAKEWORTH BLVD' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1Mi E of CR809/Military T' (1) ·
'9.5 MI S OF CR-880 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'ADJACENT TO US-441 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'IN JOHN PRINCE PARK ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.