Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
24350 (1) ·
55380 (1) ·
55385 (1) ·
77275 (1) ·
Belle Glade (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Delray Beach (1) ·
Fort Pierce (1) ·
Greenacres City (1) ·
Lake Park (1) ·
Melbourne Village (1) ·
Palm Beach Gardens (1) ·
Palm Shores (1) ·
Royal Palm Beach village (1) ·
Tequesta village (1)
'C-51 Canal ' (1) ·
'E-3 CANAL ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'Indian River Relief East' (1) ·
'Indian River West Relief' (1) ·
'L-12 Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Miami Canal L-25 ' (1) ·
'N Fork Loxahatchee River' (1) ·
'RELIEF CANAL ' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 N/S TPK ' (1) ·
'US-192 ' (1)
'Benoist Farms Rd ' (1) ·
'BISCAYNE DRIVE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'I-95 ' (1) ·
'LA MANCHA AVE. ' (1) ·
'Levee Road ' (1) ·
'MADRID STREET ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-27/SR-80 NB ' (1) ·
'US-27/SR-80 SB ' (1)
700076 (1) ·
700078 (1) ·
700142 (1) ·
700144 (1) ·
700209 (1) ·
930006 (1) ·
930438 (1) ·
930537 (1) ·
930538 (1) ·
930806 (1) ·
931011 (1) ·
934148 (1) ·
934149 (1) ·
934711 (1) ·
935501 (1) ·
935750 (1) ·
936776 (1) ·
937358 (1) ·
937359 (1) ·
940050 (1) ·
940053 (1) ·
940162 (1) ·
940163 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'At John Stretch Park ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'I-95 over US-192 ' (1) ·
'No. City Line Boca Raton ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 EB -Indian Riv Rel' (1) ·
'SR-404 WB - Indian River ' (1) ·
'SR-404 WB-Indian River ' (1) ·
'SR-710 TPK Interchange ' (1)
26252016 (1) ·
26252859 (1) ·
26314057 (1) ·
26373441 (1) ·
26404400 (1) ·
26414539 (1) ·
26414600 (1) ·
26430840 (1) ·
26433343 (1) ·
26455204 (1) ·
26481194 (1) ·
26483417 (1) ·
26483495 (1) ·
26572884 (1) ·
27222822 (1) ·
27243006 (1) ·
27271705 (1) ·
27271802 (1) ·
28044400 (1) ·
28121937 (1) ·
28122002 (1) ·
28122580 (1) ·
28122646 (1)
80042598 (1) ·
80045345 (1) ·
80061282 (1) ·
80074708 (1) ·
80075210 (1) ·
80075215 (1) ·
80075217 (1) ·
80075297 (1) ·
80102700 (1) ·
80130371 (1) ·
80130890 (1) ·
80230229 (1) ·
80235637 (1) ·
80235639 (1) ·
80240119 (1) ·
80295638 (1) ·
80383763 (1) ·
80383781 (1) ·
80392343 (1) ·
80392362 (1) ·
80422199 (1) ·
80482471 (1) ·
80482472 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)