Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930053 (1) ·
930402 (1) ·
930407 (1) ·
930408 (1) ·
930461 (1) ·
930462 (1) ·
930465 (1) ·
930472 (1) ·
930473 (1) ·
930474 (1) ·
930524 (1) ·
930525 (1) ·
930527 (1) ·
930539 (1)
'.25m W of US-1 on US-98 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'4 miles west of SR 7 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-700 CANAL POINT ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 14 results in range #1 to #14.