Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'NB I 95 SR 9 ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'NW 5TH STREET ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-98 SR700 US441 ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
930003 (1) ·
930030 (1) ·
930409 (1) ·
930410 (1) ·
930416 (1) ·
930465 (1) ·
930499 (1) ·
930500 (1) ·
931001 (1) ·
931006 (1)
'0.4 MI W of SR-7 (US-441)' (1) ·
'1.5 miles South of SR 806' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'Just North of SR-850 ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-700 CANAL POINT ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1)
104500 (1) ·
106800 (1) ·
21000 (1) ·
26500 (1) ·
3200 (1) ·
32750 (1) ·
3825 (1) ·
7100 (1) ·
78500 (1) ·
98900 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12318 (1) ·
136198 (1) ·
171592 (1) ·
181308 (1) ·
185298 (1) ·
36435 (1) ·
45978 (1) ·
5552 (1) ·
56821 (1) ·
7980 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)