Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'BRANCH OF ICWW ' (1) ·
'Creek ' (1) ·
'E-1-E CANAL ' (1) ·
'E-2-E Canal ' (1) ·
'Eau Gallie River ' (1) ·
'EL RIO CANAL ' (1) ·
'Elbow Creek ' (1) ·
'Halifax River ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'L-19 Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'LWDD E-3 Canal ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'SR-68 ' (1)
'21ST ST SW ' (1) ·
'61ST./PECAN GROVE ' (1) ·
'CR-717 ' (1) ·
'Gateway Blvd. ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'Hypoluxo Rd ' (1) ·
'Indian Lake Road ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'Levee Road ' (1) ·
'MARINA BLVD. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR-A1A ' (1) ·
'SR806 Atlantic Ave' (1) ·
'US-1 ' (1)
700007 (1) ·
700008 (1) ·
790147 (1) ·
790801 (1) ·
884038 (1) ·
884047 (1) ·
930032 (1) ·
930072 (1) ·
930307 (1) ·
930486 (1) ·
930487 (1) ·
930807 (1) ·
930808 (1) ·
930809 (1) ·
934126 (1) ·
934363 (1) ·
934944 (1) ·
935508 (1) ·
940096 (1) ·
940097 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'0.5MI W of SR-809 Mil Trl' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0 Mi South of CR-827 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'13.5 Mi S/O S/B E of US27' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'300' E of FL Turnpike ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'6.3MI S of SoBay at US-27' (1) ·
'A1A-Port Orange Relief ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Just North of SR70 on I95' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1- Eau Gallie River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)