Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'E-2-E Canal ' (1) ·
'E-3 CANAL ' (1) ·
'E3-canal ' (1) ·
'L-14 CANAL ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'BISCAYNE DRIVE ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Haverhill Rd ' (1) ·
'JOG ROAD ' (1) ·
'KELLER ROAD ' (1) ·
'Lake Worth Road ' (1) ·
'Lantana Road ' (1) ·
'Melaleuca Lane ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR91 N/S TPK 92.1 ' (1) ·
'SR91 N/S TPK 93.3 ' (1)
930223 (1) ·
930334 (1) ·
930373 (1) ·
930456 (1) ·
931001 (1) ·
934315 (1) ·
934329 (1) ·
934359 (1) ·
934361 (1) ·
934365 (1) ·
934366 (1) ·
934940 (1) ·
935750 (1) ·
936350 (1)
'.75 miles South of SR-882' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 MI NO OF LANTANA RD ' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'Lake Worth Rd at FL Trnpk' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)