Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700015 (1) ·
700028 (1) ·
700133 (1) ·
700140 (1) ·
700158 (1) ·
790004 (1) ·
790087 (1) ·
790105 (1) ·
930298 (1) ·
930299 (1) ·
930493 (1)
'0.25 Mi. West of SR-405 ' (1) ·
'0.7MI W OF SR-401 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'NW quad SR811/786 intchge' (1) ·
'SR-528 EB - SR-401 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
'US-1 NB - FECRR ' (1) ·
'US-1 SB over FECRR ' (1) ·
1.3 Mi. East of CR-507 (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)