Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'E-1 CANAL ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Lake Ida Road ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'South Relief Canal ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SW 10th St. Lowson Blvd ' (1) ·
'US-192 ' (1) ·
Addison Canal (1) ·
Wickham Road (1)
700209 (1) ·
700222 (1) ·
700229 (1) ·
880089 (1) ·
930459 (1) ·
930496 (1) ·
930497 (1) ·
930502 (1) ·
930525 (1) ·
930527 (1) ·
931000 (1) ·
931009 (1) ·
931010 (1) ·
934360 (1)
'0.5 mi N of Atlantic Ave ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2.7 Miles South of SR-60 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'E Congress Ave & S SR 806' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 over US-192 ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
117980 (1) ·
118848 (1) ·
122864 (1) ·
125788 (1) ·
136198 (1) ·
137065 (1) ·
157712 (1) ·
171592 (1) ·
176174 (1) ·
181308 (1) ·
19104 (1) ·
28628 (1) ·
63328 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)