Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Kind 043a :
Prestressed concrete continuous or
Steel continuous
& Inspect Date 090:
07-16
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'C-51 CANAL ' (1) ·
'I 95 and SR 704 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Indian River ' (1) ·
'IWW Halifax River ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Okeechobee Waterway ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 N/S TPK ' (1) ·
'Turkey Creek ' (1)
'Belvede to NB I-95' (1) ·
'Clint Moore Road ' (1) ·
'Congress Avenue ' (1) ·
'CR-714 Indian St. ' (1) ·
'CR-880 ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'US-1 ' (1) ·
'WB SR704 to SB I95' (1)
700061 (1) ·
700137 (1) ·
700203 (1) ·
790174 (1) ·
790175 (1) ·
894062 (1) ·
930202 (1) ·
930459 (1) ·
930469 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930485 (1) ·
930493 (1) ·
930494 (1) ·
930525 (1) ·
930527 (1) ·
930528 (1) ·
930940 (1) ·
931011 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'2 miles west of Turnpike ' (1) ·
'Between SR704 and 12th St' (1) ·
'East Tpk & West SR 809 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-710 TPK Interchange ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
'US-1 over Turkey Creek ' (1)
26241735 (1) ·
26404100 (1) ·
26404380 (1) ·
26404904 (1) ·
26404970 (1) ·
26405302 (1) ·
26410771 (1) ·
26411352 (1) ·
26411700 (1) ·
26412225 (1) ·
26412326 (1) ·
26412375 (1) ·
26412530 (1) ·
26413650 (1) ·
26413700 (1) ·
26422570 (1) ·
26424967 (1) ·
26481194 (1) ·
26504600 (1) ·
27093370 (1) ·
28015978 (1) ·
28212281 (1) ·
28212408 (1) ·
29134915 (1) ·
29135230 (1)
80040300 (1) ·
80040450 (1) ·
80040574 (1) ·
80040575 (1) ·
80040933 (1) ·
80041000 (1) ·
80041281 (1) ·
80041660 (1) ·
80042465 (1) ·
80042805 (1) ·
80043790 (1) ·
80050018 (1) ·
80052390 (1) ·
80054600 (1) ·
80064300 (1) ·
80075297 (1) ·
80084280 (1) ·
80121090 (1) ·
80151390 (1) ·
80232057 (1) ·
80344732 (1) ·
80430520 (1) ·
80430569 (1) ·
81011854 (1) ·
81012071 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)