Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ATLANTIS WATERWAY ' (1) ·
'Barge Canal ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'COLLIER WATERWAY ' (1) ·
'E-2W CANAL ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Intracoastal Waterway ' (1) ·
'L.W.D.D. #10 ' (1) ·
'RELIEF CANAL ' (1) ·
'ROEBUCK CREEK ' (1) ·
'Service Rd & Canal ' (1) ·
'St. Lucie River ' (1) ·
'WARNER CREEK ' (1)
'BUCKSKIN TRAIL ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'DAVIS ROAD ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'ENGLAR DRIVE ' (1) ·
'LOCKS ROAD ' (1) ·
'ORANGE TREE DR ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'Southern Boulevard' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-3 ' (1) ·
'SR-401 SB ' (1) ·
'SR91 SB ON RP 81.9' (1) ·
'TROON DR ' (1) ·
'TROPICALIA AVE. ' (1) ·
'WB Spanish River ' (1)
700030 (1) ·
700031 (1) ·
700072 (1) ·
885601 (1) ·
885603 (1) ·
890003 (1) ·
890015 (1) ·
894050 (1) ·
894051 (1) ·
894052 (1) ·
930097 (1) ·
930154 (1) ·
930226 (1) ·
931008 (1) ·
934299 (1) ·
935001 (1) ·
935002 (1) ·
937201 (1) ·
937352 (1) ·
937361 (1) ·
937362 (1) ·
937363 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'0.1MI N OF CLUBHOUSE BLVD' (1) ·
'0.25 MI N OF ATLANTIC AVE' (1) ·
'0.2Mi E of CR-723 ' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.5Mi W of SR-76 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'150FT S OF N CNTRY CLBDR ' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'At US-441 Southern Blvd ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26231074 (1) ·
26231130 (1) ·
26272575 (1) ·
26354425 (1) ·
26354653 (1) ·
26375694 (1) ·
26403161 (1) ·
26405650 (1) ·
26423784 (1) ·
26423785 (1) ·
26435320 (1) ·
26435409 (1) ·
27020590 (1) ·
27060944 (1) ·
27062187 (1) ·
27121243 (1) ·
27134072 (1) ·
27453074 (1) ·
27464133 (1) ·
28242777 (1) ·
28243313 (1) ·
28243314 (1)
80025423 (1) ·
80041209 (1) ·
80041536 (1) ·
80054780 (1) ·
80055088 (1) ·
80063334 (1) ·
80103398 (1) ·
80133989 (1) ·
80134000 (1) ·
80134407 (1) ·
80134460 (1) ·
80140376 (1) ·
80154065 (1) ·
80161911 (1) ·
80162515 (1) ·
80170170 (1) ·
80241142 (1) ·
80284214 (1) ·
80290638 (1) ·
80375608 (1) ·
80375690 (1) ·
80422154 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)