Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'C-1 Canal ' (1) ·
'C-18 Canal ' (1) ·
'CANAL ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'Salerno Creek ' (1) ·
'SR-524 ' (1) ·
'St. Lucie Canal/SR-76 ' (1) ·
'St. Lucie River ' (1) ·
'St.Lucie River ' (1) ·
'Tomoka River ' (1) ·
'Troup Indiantown Canal ' (1) ·
'US 92 ' (1)
'AUDUBON CSWY ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'E/B S.R. 704 ' (1) ·
'E/B S.R. A1A ' (1) ·
'I-4 EB Ramp A ' (1) ·
'I-4 Ramp B ' (1) ·
'Loxahatchee Rvr Rd' (1) ·
'Palm Bay Parkway ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR-715 ' (1) ·
'US 192 WB ' (1) ·
'US-1 SB ' (1) ·
'Viera Blvd EB ' (1) ·
'Viera Blvd WB ' (1) ·
'W/B S.R. 704 ' (1) ·
'W/B S.R. A1A ' (1)
700153 (1) ·
700219 (1) ·
700233 (1) ·
704097 (1) ·
704098 (1) ·
705924 (1) ·
790185 (1) ·
790208 (1) ·
790248 (1) ·
890158 (1) ·
890160 (1) ·
890161 (1) ·
890162 (1) ·
894053 (1) ·
894055 (1) ·
930471 (1) ·
930506 (1) ·
930507 (1) ·
934179 (1) ·
936451 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.25 Mile N of Center St.' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.6 MILE WEST OF US-1 ' (1) ·
'1.2 Miles East of SR-710 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'I-4 Connector over US-92 ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'SR-520 WB - Banana River ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-1 SB - Tomoka River ' (1) ·
'Viera Blvd EB over I-95 ' (1) ·
'Viera Blvd WB over I-95 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)