Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700012 (1) ·
884084 (1) ·
890120 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930210 (1) ·
930334 (1) ·
930442 (1) ·
930491 (1) ·
930528 (1) ·
934711 (1)
'.7mi. E of Congress Ave. ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3mi. South of Linton ' (1) ·
'1st overpass east of I-95' (1) ·
'2MI E of SR-76 ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Boca Raton ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'US-1 - FECRR ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 12 results in range #1 to #12.