Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service Under 042b:
Other
& Inspect Date 090:
06-17
& Scour 113:
Bridge not over waterway.
Use the filters below to narrow your results.
700226 (1) ·
790203 (1) ·
790204 (1) ·
790205 (1) ·
790206 (1) ·
790207 (1) ·
790247 (1) ·
930298 (1) ·
930299 (1) ·
934175 (1) ·
934483 (1)
.1 Mi E of I-95 (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'0.95 MI N of PGA Blvd. ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'SR 400 - Dear Crossing ' (1) ·
'SR 400 EB - Bear Crossing' (1) ·
'SR 400 EB - Cougar Crossi' (1) ·
'SR 400 WB over Deer Wildl' (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)