Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Place 004:
Boynton Beach
& Service On 042a:
Highway - Pedestrian
& Inspect Date 090:
06-17
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'Boynton Canal C16 ' (1) ·
'CANAL E-4 ' (1) ·
'CSX RR ' (1) ·
'E-3 CANAL ' (1) ·
'E-4 CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1)
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'LAWRENCE ROAD ' (1) ·
'LE CHALET BLVD ' (1) ·
'MINER RD. ' (1) ·
'Quantum Blvd. ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR 804 ' (1) ·
'SR 804 Boyton B B ' (1) ·
'US1(SR5) ' (1) ·
'WEST OCEAN DRIVE ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
930001 (1) ·
930237 (1) ·
930285 (1) ·
930289 (1) ·
930438 (1) ·
934468 (1) ·
934469 (1) ·
934487 (1) ·
934491 (1) ·
934499 (1) ·
934914 (1) ·
934942 (1) ·
934948 (1) ·
935300 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1 mile West of US 1 ' (1) ·
'Just West of I 95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)