Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'C-17 Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'I-4 ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'St. Lucie Canal/SR-76 ' (1) ·
'St. Lucie River ' (1) ·
'St.Lucie River ' (1) ·
'Tomoka River ' (1) ·
'US 92 ' (1)
'E/B S.R. 704 ' (1) ·
'E/B S.R. A1A ' (1) ·
'EB Blue Heron Blvd' (1) ·
'I-4 EB Ramp A ' (1) ·
'I-4 Ramp B ' (1) ·
'SR A1A ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-520 WB ' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR-715 ' (1) ·
'SR-A1A ' (1) ·
'US 192 WB ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-98 SR700 US441 ' (1) ·
'W/B S.R. 704 ' (1) ·
'W/B S.R. A1A ' (1)
700219 (1) ·
700233 (1) ·
790174 (1) ·
790175 (1) ·
790185 (1) ·
790186 (1) ·
790208 (1) ·
790248 (1) ·
890158 (1) ·
890160 (1) ·
890161 (1) ·
890162 (1) ·
930465 (1) ·
930468 (1) ·
930471 (1) ·
930506 (1) ·
930507 (1) ·
940003 (1) ·
940004 (1) ·
940085 (1)
'0.23 MI N FPL POWER PLANT' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1 Mile East of I-95 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'3mi East of SR5 on A1A ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'Between SRA1A&SR80 Cswys.' (1) ·
'I-4 Connector over US-92 ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-520 WB - Banana River ' (1) ·
'SR-700 CANAL POINT ' (1) ·
'US 192 WB over Indian Riv' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 SB - Tomoka River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)