Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700014 (1) ·
700108 (1) ·
880090 (1) ·
880091 (1) ·
890159 (1) ·
930265 (1) ·
930407 (1) ·
930486 (1) ·
934297 (1) ·
941001 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 WB - US-1 & FECRR ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)