Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR726(CITRUS BLVD)' (1) ·
'I 95 SR 9 SB ' (1) ·
'Levee Road ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'ST LUCIE BLVD ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
890015 (1) ·
894014 (1) ·
930291 (1) ·
930292 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930805 (1) ·
931006 (1) ·
934499 (1)
'0.4MI NE OF A1A ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'1.5 miles South of SR 806' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'300FT East of CR-717 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-80 & Military Trail ' (1)
100 (1) ·
104500 (1) ·
10900 (1) ·
115000 (1) ·
21000 (1) ·
2600 (1) ·
3111 (1) ·
43000 (1) ·
7100 (1) ·
98900 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12318 (1) ·
150 (1) ·
171592 (1) ·
181308 (1) ·
18912 (1) ·
199525 (1) ·
36435 (1) ·
4511 (1) ·
5398 (1) ·
74605 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)