Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'City St. & Crane Creek ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'Halifax River IWW ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Indian River EastRelief ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Worth Relief ' (1) ·
'Loxahatchee River ' (1) ·
'RELIEF CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1) ·
'West Palm Beach Canal ' (1) ·
'WPB Drainage Canal ' (1)
'Becker Rd. ' (1) ·
'Blue Heron Blvd ' (1) ·
'Clint Moore Road ' (1) ·
'CR-4009 ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'Hanley Rd. S 25th ' (1) ·
'I-95 (SR 9) ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'Port St. John Pkwy' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR A1A ' (1) ·
'SR-40 ' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'US-1 ' (1) ·
'US-192 ' (1)
700006 (1) ·
700199 (1) ·
700235 (1) ·
790132 (1) ·
794193 (1) ·
884065 (1) ·
930202 (1) ·
930269 (1) ·
930285 (1) ·
930339 (1) ·
930409 (1) ·
930540 (1) ·
930545 (1) ·
941001 (1) ·
944016 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1 mile West of US 1 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'City of Jupiter ' (1) ·
'Port St. John Pkwy - I-95' (1) ·
'SR-40 over IWW ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-A1A East of ICWW ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-192 - Indian River Rel' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)