Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service On 042a:
Highway - Pedestrian
& Superstructure 059:
Satisfactory
& Inspect Date 090:
06-16
Use the filters below to narrow your results.
'Barge Canal ' (1) ·
'City St. & Crane Creek ' (1) ·
'FEC Railroad ' (1) ·
'GARDEN CANAL ' (1) ·
'Halifax River ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'I-4 ' (1) ·
'Indian River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'IWW Indian River ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'Tide Relief Canal ' (1) ·
'Turkey Creek ' (1)
'CAMINO GARDENS BL ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DUDA ROAD ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'Enterprise Rd. ' (1) ·
'LINTON BLVD. ' (1) ·
'SR-3 ' (1) ·
'SR-44 ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-A1A ' (1) ·
'US-1 ' (1) ·
'WB Spanish River ' (1)
700006 (1) ·
700072 (1) ·
700201 (1) ·
700203 (1) ·
790147 (1) ·
790172 (1) ·
790191 (1) ·
880051 (1) ·
890107 (1) ·
930154 (1) ·
930226 (1) ·
930322 (1) ·
930361 (1) ·
934332 (1) ·
934519 (1) ·
935206 (1) ·
940047 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'A1A on Singer Island ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 over Turkey Creek ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.