Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service On 042a:
Highway - Pedestrian
& Superstructure 059:
Fair
& Inspect Date 090:
06-16
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'COLLIER CREEK ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'St. Lucie River ' (1)
'BRANT DR/CARL BOTT' (1) ·
'CORKSCREW BLVD. ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'EB SR 802 Lake Ave' (1) ·
'EB SR706 ' (1) ·
'FLEMING STREET ' (1) ·
'LE CHALET BLVD ' (1) ·
'MARINA BLVD. ' (1) ·
'MURPHY RD ' (1) ·
'NW 5TH STREET ' (1) ·
'Southern Boulevard' (1) ·
'SR 707 (Dixie Hwy)' (1) ·
'SR-401 NB ' (1) ·
'SW 18TH ST ' (1) ·
'US-98 (SR-80) ' (1) ·
'WB SR 706 ' (1) ·
'WB SR 802 Lake Ave' (1)
700117 (1) ·
884053 (1) ·
884065 (1) ·
885604 (1) ·
890003 (1) ·
894003 (1) ·
930030 (1) ·
930053 (1) ·
930097 (1) ·
930104 (1) ·
930318 (1) ·
930453 (1) ·
930454 (1) ·
934487 (1) ·
934502 (1) ·
934943 (1) ·
934944 (1) ·
935218 (1) ·
935501 (1)
'.25m W of US-1 on US-98 ' (1) ·
'.2MI S of LINDELL BLVD ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'1/4Mi W of New Roosevelt ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'SR-401 NB - Barge Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)