Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CYPRESS CREEK ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Pine Street ' (1) ·
'SR-404 ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'LYONS ROAD ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'S. VERDE TRAIL ' (1) ·
'SR-528 EB ' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'US-1 SB ' (1) ·
'WB SR808 Glades Rd' (1)
700075 (1) ·
700151 (1) ·
930245 (1) ·
934128 (1) ·
934129 (1) ·
934148 (1) ·
934149 (1) ·
934313 (1) ·
934345 (1) ·
934346 (1) ·
934903 (1) ·
934916 (1) ·
934925 (1) ·
934926 (1) ·
934936 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1)
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'800 ft West of I 95 ' (1) ·
'At S Military Trail ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'US-1 SB - SR-404 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)