Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Donald Ross Road ' (1) ·
'Eau Gallie River ' (1) ·
'FECRR ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'KRUEGER CREEK ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'Lateral A Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 811 & FEC RR ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'16th St/College Ln' (1) ·
'Apollo Boulevard ' (1) ·
'Benoist Farms Rd ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'Congress Avenue ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'Hagen Ranch Road ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'US-1 ' (1)
700012 (1) ·
705604 (1) ·
884084 (1) ·
890120 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930210 (1) ·
930334 (1) ·
930373 (1) ·
930382 (1) ·
930383 (1) ·
930442 (1) ·
930491 (1) ·
930528 (1) ·
934293 (1) ·
934711 (1) ·
934958 (1)
'.75 miles South of SR-882' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3mi. South of Linton ' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2MI E of SR-76 ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Boca Raton ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'US-1 - FECRR ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.