Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boca Inlet ' (1) ·
'BUCCANEER CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'CAMINO CANAL ' (1) ·
'COLLIER CREEK ' (1) ·
'CPB20 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FISHTAIL CANAL ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-513 ' (1)
'A1A ' (1) ·
'CRESTHAVEN BLVD ' (1) ·
'CYPRESS WAY ' (1) ·
'DATE PALM RD ' (1) ·
'DATE PALM ROAD ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'FLEMING STREET ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'PONCE DE LEON ST ' (1) ·
'PURDY LANE ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-404 WB ' (1) ·
'SW 18TH ST ' (1) ·
'WALLIS ROAD ' (1) ·
'WB SR 802 Lake Ave' (1) ·
'WOOLBRIGHT ROAD ' (1)
700083 (1) ·
885604 (1) ·
930030 (1) ·
930060 (1) ·
930104 (1) ·
930214 (1) ·
930318 (1) ·
930360 (1) ·
934223 (1) ·
934322 (1) ·
934326 (1) ·
934464 (1) ·
934465 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
935205 (1) ·
935218 (1) ·
937355 (1) ·
937360 (1)
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.25MI E OF US 1 ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.3MI W OF OLD DIXIE HWY.' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.5 MI W OF HAVERHILL RD ' (1) ·
'0.5MI W OF HAVERHILL ROAD' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1MI W of SR809 MIL. TRL ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'SR-404 WB - SR-513 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)