Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'6th Avenue South ' (1) ·
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'Belvedere Road ' (1) ·
'CR 708 ' (1) ·
'I-95 (SR-9) ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR 60 ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'SR 806 W Atlantic Avenue' (1)
'Belvede to NB I-95' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR 9 (I-95) ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
880102 (1) ·
890117 (1) ·
890118 (1) ·
930385 (1) ·
930390 (1) ·
930458 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930484 (1) ·
930485 (1) ·
930486 (1) ·
930487 (1) ·
930503 (1) ·
930504 (1)
'0.3 mile North of SR 80 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'I-95 / SR 706 interchange' (1) ·
'I-95 over SR-60 ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'North of Belvedere Rd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB I-95 over CR 708 ' (1)
10000 (1) ·
104500 (1) ·
114500 (1) ·
14000 (1) ·
16000 (1) ·
17500 (1) ·
232000 (1) ·
3400 (1) ·
40500 (1) ·
43500 (1) ·
4800 (1) ·
5300 (1) ·
5800 (1) ·
7300 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
12666 (1) ·
17350 (1) ·
181308 (1) ·
198658 (1) ·
24290 (1) ·
27760 (1) ·
30362 (1) ·
402520 (1) ·
5899 (1) ·
70268 (1) ·
75473 (1) ·
8328 (1) ·
9196 (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)