Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL-17 ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'El Rio Canal ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I 95 SR 9 ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'RCA CANAL ' (1) ·
'SR-507 ' (1)
'57th Street ' (1) ·
'Australian Ave. ' (1) ·
'CAMINO REAL ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Hypoluxo Rd ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'Melaleuca Lane ' (1) ·
'NW 13 ST ' (1) ·
'Old Dixie Highway ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'Spanish River Blvd' (1) ·
'SR-15 Main St. ' (1) ·
'SR-507 ' (1)
700186 (1) ·
884093 (1) ·
930338 (1) ·
930359 (1) ·
930529 (1) ·
934139 (1) ·
934329 (1) ·
934361 (1) ·
934362 (1) ·
934365 (1) ·
934366 (1) ·
934499 (1) ·
934954 (1) ·
934960 (1) ·
934964 (1) ·
935215 (1) ·
935222 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'At East Canal St. ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'North of P. Beach Airport' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-507 over Crane Creek ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.