Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer Wildlife Crossing ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'ICWW ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'ST LUCIE CANAL ' (1) ·
'St Lucie River / SR-707 ' (1) ·
'St. Lucie River/SR-707 ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1) ·
'WB SR 80 ' (1)
'DNLD RS RD E 112.2' (1) ·
'DNLD RS RD W 112.2' (1) ·
'FOREST HILL BLVD. ' (1) ·
'HATTON HIGHWAY ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Lake Worth Road ' (1) ·
'NB SR 807 ' (1) ·
'NB US-1 / SR-5 ' (1) ·
'PALMETTO PK RD ' (1) ·
'PARK AVE. W. ' (1) ·
'SB SR 807 ' (1) ·
'SB US-1/SR-5 ' (1) ·
'SR 400 WB ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-400 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR-A1A (Ocean Ave)' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-98 (SR-80) ' (1)
790196 (1) ·
790197 (1) ·
790205 (1) ·
790207 (1) ·
790247 (1) ·
890066 (1) ·
890150 (1) ·
890151 (1) ·
890152 (1) ·
930053 (1) ·
930381 (1) ·
930401 (1) ·
930419 (1) ·
930450 (1) ·
930456 (1) ·
930475 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1) ·
931004 (1) ·
934164 (1) ·
934213 (1) ·
934553 (1) ·
934902 (1)
'.25m W of US-1 on US-98 ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'4.03Miles E of SR5 on A1A' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'i-4 WB - Cougar Crossing ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'N.OF PGA BLVD S.JUPITER ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 400 WB over Deer Wildl' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
26210226 (1) ·
26220386 (1) ·
26222805 (1) ·
26370347 (1) ·
26403272 (1) ·
26403485 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
26404472 (1) ·
26405249 (1) ·
26470110 (1) ·
26475062 (1) ·
26525829 (1) ·
26525885 (1) ·
27070362 (1) ·
27120317 (1) ·
27121800 (1) ·
27122400 (1) ·
28500676 (1) ·
28500808 (1) ·
29043900 (1) ·
29060018 (1) ·
29064300 (1)
80033598 (1) ·
80045427 (1) ·
80045433 (1) ·
80045945 (1) ·
80045990 (1) ·
80052450 (1) ·
80074511 (1) ·
80075174 (1) ·
80075197 (1) ·
80095982 (1) ·
80101517 (1) ·
80102258 (1) ·
80113000 (1) ·
80121129 (1) ·
80144936 (1) ·
80152627 (1) ·
80153156 (1) ·
80162980 (1) ·
80325180 (1) ·
81083300 (1) ·
81091401 (1) ·
81103100 (1) ·
81190878 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)