Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Traffic Year 030:
2016
& Service Under 042b:
Highway - Waterway
& Inspect Date 090:
05-16
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'City St. & Crane Creek ' (1) ·
'CR-515 & Indian River ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Indian River ' (1) ·
'IWW Halifax River ' (1) ·
'IWW Indian River ' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'St. Lucie Canal/SR-76 ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1)
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR 807 ' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR 807 ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-44 ' (1) ·
'SR-520 EB ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR-A1A ' (1) ·
'US-1 ' (1)
700006 (1) ·
700015 (1) ·
700061 (1) ·
700109 (1) ·
700137 (1) ·
790148 (1) ·
790152 (1) ·
790174 (1) ·
790175 (1) ·
790196 (1) ·
790197 (1) ·
880100 (1) ·
890161 (1) ·
890162 (1) ·
930475 (1) ·
930479 (1) ·
930480 (1) ·
930497 (1) ·
930498 (1) ·
930532 (1) ·
934907 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940114 (1)
'0.5 mi N of Atlantic Ave ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'SR-A1A over Halifax River' (1) ·
'US-1 - Crane Cr & City St' (1)
26210118 (1) ·
26280900 (1) ·
26403485 (1) ·
26403530 (1) ·
26411352 (1) ·
26411700 (1) ·
27004322 (1) ·
27004488 (1) ·
27171853 (1) ·
27172347 (1) ·
27281041 (1) ·
27281411 (1) ·
27363540 (1) ·
28043878 (1) ·
28212281 (1) ·
28212408 (1) ·
28240428 (1) ·
28240489 (1) ·
28500676 (1) ·
28500808 (1) ·
29012564 (1) ·
29085374 (1) ·
29134915 (1) ·
29135230 (1)
80042465 (1) ·
80042805 (1) ·
80045945 (1) ·
80045990 (1) ·
80052100 (1) ·
80052215 (1) ·
80101404 (1) ·
80251481 (1) ·
80251602 (1) ·
80252971 (1) ·
80254109 (1) ·
80271724 (1) ·
80271798 (1) ·
80304170 (1) ·
80360835 (1) ·
80430520 (1) ·
80430569 (1) ·
80444559 (1) ·
80444580 (1) ·
80550332 (1) ·
80583172 (1) ·
81011854 (1) ·
81012071 (1) ·
81190878 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)