Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BARBER STREET ' (1) ·
'ENGLAR DRIVE ' (1) ·
'FLEMING STREET ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-80 ' (1) ·
'SR-808 (Glades Rd)' (1)
700058 (1) ·
700059 (1) ·
700132 (1) ·
700134 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
930029 (1) ·
930319 (1) ·
930409 (1) ·
930410 (1) ·
935100 (1) ·
940092 (1) ·
940093 (1) ·
940096 (1) ·
940097 (1)
'.2mi East of US-27 ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'Just North of SR70 on I95' (1) ·
'SR-7 & SR-80 intersection' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)