Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Summit Boulevard ' (1) ·
'Turnpike (SR-91) ' (1) ·
'WPB Drainage Canal ' (1)
'45th Street CR-702' (1) ·
'Australian Ave. ' (1) ·
'Congress Avenue ' (1) ·
'EB SR 704 ' (1) ·
'EB US 98 SR 80 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 (SR 9) ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'WB US 98 SR 80 ' (1)
930210 (1) ·
930292 (1) ·
930461 (1) ·
930462 (1) ·
930477 (1) ·
930478 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930484 (1) ·
930488 (1) ·
930489 (1) ·
930528 (1) ·
930529 (1) ·
930539 (1) ·
930540 (1) ·
934166 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.25 mi N of Belvedere Rd' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.0 M West of Haverhill R' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR704 and 12th St' (1) ·
'Just N. of Southern Blvd ' (1) ·
'North of P. Beach Airport' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1)
114500 (1) ·
115000 (1) ·
16000 (1) ·
17500 (1) ·
19300 (1) ·
213000 (1) ·
27500 (1) ·
28250 (1) ·
32250 (1) ·
3400 (1) ·
4800 (1) ·
5300 (1) ·
5800 (1) ·
6042 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
10875 (1) ·
198658 (1) ·
199525 (1) ·
27760 (1) ·
30362 (1) ·
33486 (1) ·
369555 (1) ·
47712 (1) ·
49014 (1) ·
55954 (1) ·
5899 (1) ·
8328 (1) ·
9196 (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)