Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL ' (1) ·
'CANAL L-30 ' (1) ·
'CSX Railroad ' (1) ·
'DIRT FARM ROAD ' (1) ·
'EL RIO (E-4) CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I-95 (SR-9) ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'Lateral Canal 30 ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1)
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'EL CLAIR RANCH RD.' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'I 95 SR 9 ' (1) ·
'ISLAND DRIVE ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'LINTON BLVD. ' (1) ·
'LOWSON BOULEVARD ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR806 Atlantic Ave' (1)
930069 (1) ·
930215 (1) ·
930442 (1) ·
930443 (1) ·
930455 (1) ·
934419 (1) ·
934482 (1) ·
934483 (1) ·
934918 (1) ·
934930 (1) ·
934931 (1) ·
934932 (1) ·
934933 (1) ·
934936 (1) ·
934937 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
935506 (1) ·
935507 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03 MI W OF ANDREWS AVE ' (1) ·
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.2 MI W of CONGRESS AVE ' (1) ·
'0.2MI S OF LAKE IDA ROAD ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8Mi W of JOG/CARTER RD.' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'0.9MI N OF LAKE IDA ROAD ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'Just W. of Congress Ave.' (1)
26251431 (1) ·
26251444 (1) ·
26252638 (1) ·
26252703 (1) ·
26252706 (1) ·
26260295 (1) ·
26262125 (1) ·
26264610 (1) ·
26270705 (1) ·
26273366 (1) ·
26280864 (1) ·
26280868 (1) ·
26281369 (1) ·
26290100 (1) ·
26290167 (1) ·
26290169 (1) ·
26290212 (1) ·
26290213 (1) ·
26290227 (1) ·
26290244 (1) ·
26290245 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)