Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-51 Canal ' (1) ·
'CANAL-17 ' (1) ·
'CLEAR LAKE ' (1) ·
'El Rio Canal E-4 ' (1) ·
'L-5 Canal ' (1) ·
'Lake Ida Road ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'S-5 Discharge Canal ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'St Johns River Relief ' (1) ·
'Tide Relief Canal ' (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CONGRESS AVE ' (1) ·
'EB SR60 ' (1) ·
'Levee Road ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB US-27 SR-25 ' (1) ·
'Old Dixie Highway ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'Park Road ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR-415 ' (1) ·
'SR-60 WB ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-A1A ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'WEST OCEAN DRIVE ' (1)
790198 (1) ·
884057 (1) ·
884059 (1) ·
930142 (1) ·
930319 (1) ·
930352 (1) ·
930353 (1) ·
930359 (1) ·
930361 (1) ·
930495 (1) ·
930496 (1) ·
930801 (1) ·
930811 (1) ·
934277 (1) ·
934299 (1) ·
934491 (1) ·
935300 (1) ·
937707 (1)
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.7MI N of Northlake Blvd' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'2.6MI W OF SEMINOLE PRATT' (1) ·
'21.0 Mi North of US-27 ' (1) ·
'A1A on Singer Island ' (1) ·
'At US-441 Southern Blvd ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'Palm Beach - Broward Line' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)