Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'HAVERHILL ROAD ' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'PALMETTO PK RD ' (1) ·
'SR A1A ' (1) ·
'SR-404 EB ' (1) ·
'SR-A1A NB ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'US98&441 SR700&15' (1) ·
'W. CAMINO REAL ' (1) ·
I-95 (1) ·
SR-A1A SB (1) ·
US-1 (1)
700145 (1) ·
700206 (1) ·
700210 (1) ·
700211 (1) ·
700229 (1) ·
884058 (1) ·
884060 (1) ·
930091 (1) ·
934256 (1) ·
934406 (1) ·
934900 (1) ·
934901 (1) ·
934902 (1) ·
934918 (1) ·
934938 (1) ·
934939 (1) ·
934952 (1) ·
940158 (1)
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
I-95 over Addison Canal (1) ·
SR-A1A SB- George King (1) ·
US-1 over Horse Creek (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)