Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C-51 Canal ' (1) ·
'Creek ' (1) ·
'EL RIO CANAL ' (1) ·
'Hypoluxo Road ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Kyoto Gardens Dr ' (1) ·
'L-12 Canal ' (1) ·
'Little Haw Swamp ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'SR-528 ' (1) ·
SR-401 (1)
'Belvede to NB I-95' (1) ·
'CAMINO GARDENS EB ' (1) ·
'CAMINO GARDENS WB ' (1) ·
'HIGHLAND GOLF CRSE' (1) ·
'Hypoluxo to SB I95' (1) ·
'Indian Lake Road ' (1) ·
'JUPITER ISLAND PK ' (1) ·
'Levee Road ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'NBSR807 to EBSR80 ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR-407 NB ' (1) ·
'Truck Trail #12 ' (1) ·
Overpass Ramp (1)
700085 (1) ·
700218 (1) ·
790800 (1) ·
790801 (1) ·
930298 (1) ·
930474 (1) ·
930482 (1) ·
930483 (1) ·
930485 (1) ·
930493 (1) ·
930494 (1) ·
930526 (1) ·
930806 (1) ·
934126 (1) ·
935209 (1) ·
935210 (1) ·
935508 (1)
'.2MI E OF HOMEWOOD ROAD ' (1) ·
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.5MI N OF JUPITER BCH RD' (1) ·
'2.3mi N on Indian Lake Rd' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Lake George Conservation ' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
0.7 Mile N of SR-528 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)