Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
None (1) ·
58725 (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Fort Pierce (1) ·
Greenacres City (1) ·
Haverhill (1) ·
Indialantic (1) ·
Jupiter (1) ·
Lantana (1) ·
Ormond Beach (1) ·
Port St. John (1) ·
Riviera Beach (1) ·
Royal Palm Beach village (1) ·
South Daytona (1) ·
Vero Beach (1) ·
Wellington village (1)
'C-51 CANAL ' (1) ·
'City St. & Crane Creek ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'Halifax River IWW ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Indian River EastRelief ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Worth Relief ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Reed Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'Spruce Creek ' (1) ·
'Ten Mile Creek ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'West Palm Beach Canal ' (1)
'Becker Rd. ' (1) ·
'Blue Heron Blvd ' (1) ·
'Clint Moore Road ' (1) ·
'CR-4009 ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'FOREST HILL BLVD. ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'Lake Worth Road ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'PALMETTO PK RD ' (1) ·
'Port St. John Pkwy' (1) ·
'SR 804 Boyton B B ' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR A1A ' (1) ·
'SR-40 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'US-1 ' (1) ·
'US-192 ' (1)
700006 (1) ·
700199 (1) ·
700235 (1) ·
790012 (1) ·
790132 (1) ·
794193 (1) ·
884065 (1) ·
930202 (1) ·
930269 (1) ·
930276 (1) ·
930285 (1) ·
930339 (1) ·
930401 (1) ·
930409 (1) ·
930456 (1) ·
930545 (1) ·
931004 (1) ·
934213 (1) ·
934902 (1) ·
941001 (1) ·
944016 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1 mile West of US 1 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'City of Jupiter ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Port St. John Pkwy - I-95' (1) ·
'SR-40 over IWW ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'SR-A1A East of ICWW ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 over Reed Canal ' (1) ·
'US-192 - Indian River Rel' (1)
26210226 (1) ·
26220386 (1) ·
26241735 (1) ·
26314407 (1) ·
26351400 (1) ·
26370347 (1) ·
26404472 (1) ·
26404695 (1) ·
26405249 (1) ·
26465867 (1) ·
26470126 (1) ·
26565506 (1) ·
27123412 (1) ·
27234060 (1) ·
27380220 (1) ·
28043878 (1) ·
28051925 (1) ·
28271350 (1) ·
29052660 (1) ·
29093065 (1) ·
29171420 (1)
80022352 (1) ·
80025351 (1) ·
80040850 (1) ·
80042314 (1) ·
80052130 (1) ·
80052390 (1) ·
80074511 (1) ·
80095982 (1) ·
80102258 (1) ·
80120775 (1) ·
80121129 (1) ·
80144936 (1) ·
80200100 (1) ·
80205980 (1) ·
80264868 (1) ·
80343718 (1) ·
80360835 (1) ·
80491650 (1) ·
80594278 (1) ·
81013690 (1) ·
81030614 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)