Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-15 Canal ' (1) ·
'C-51 Canal ' (1) ·
'E-1 Canal ' (1) ·
'E-2W Canal ' (1) ·
'FECRR ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'KRUEGER CREEK ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'Lateral A Canal ' (1) ·
'LATERAL CANAL #30 ' (1) ·
'LWDD L30 Canal ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'Palmetto Park Road ' (1) ·
'South Relief Canal ' (1) ·
'SR 811 & FEC RR ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'16th St/College Ln' (1) ·
'Atlantic Ave. ' (1) ·
'Benoist Farms Rd ' (1) ·
'Congress Avenue ' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'CR605 Old Dixie ' (1) ·
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'Hagen Ranch Road ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR91 N/S TPK 83.91' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'US-1 ' (1) ·
'W/B Atlantic Ave ' (1)
700012 (1) ·
884084 (1) ·
884086 (1) ·
890120 (1) ·
930184 (1) ·
930187 (1) ·
930198 (1) ·
930199 (1) ·
930210 (1) ·
930334 (1) ·
930367 (1) ·
930440 (1) ·
930442 (1) ·
930463 (1) ·
930491 (1) ·
930528 (1) ·
931009 (1) ·
931010 (1) ·
934711 (1) ·
934958 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3 Mi. North of CR-606 ' (1) ·
'1.3mi. South of Linton ' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.12 MI NORTH OF SR-806 ' (1) ·
'2MI E of SR-76 ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR704 and 12th St' (1) ·
'Boca Raton ' (1) ·
'East of SR 7 on SR 806 ' (1) ·
'Inter 66th Ave/College Ln' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'US-1 - FECRR ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
11624 (1) ·
136198 (1) ·
14314 (1) ·
14748 (1) ·
15000 (1) ·
15040 (1) ·
157712 (1) ·
175235 (1) ·
177838 (1) ·
20855 (1) ·
26459 (1) ·
27760 (1) ·
33486 (1) ·
35220 (1) ·
36435 (1) ·
5205 (1) ·
55954 (1) ·
66364 (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)