bridge data > Superstructure 059:
Satisfactory
& Substructure 060:
Satisfactory
& Inspect Date 090:
04-17
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Banana River Relief East' (1) ·
'CANAL E-4 ' (1) ·
'City St. & Crane Creek ' (1) ·
'FECRR ' (1) ·
'Gabordy's Canal ' (1) ·
'Halifax River ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Indian River ' (1) ·
'LAKE IDA CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LATERAL CANAL ' (1) ·
'Misner Branch ' (1) ·
'Service Rd & Canal ' (1) ·
'Tomoka River ' (1) ·
'US-17/92 ' (1)
'21ST ST SW ' (1) ·
'53RD STREET ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'LINTON BLVD. ' (1) ·
'Main Trail ' (1) ·
'MISSION HILL ROAD ' (1) ·
'Old Dixie Hwy. ' (1) ·
'Riverside Drive ' (1) ·
'SR-401 SB ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'SR-472 ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-A1A ' (1) ·
'SW 22ND WAY ' (1) ·
'US-1 ' (1) ·
'US-92 WB ' (1) ·
'WB Spanish River ' (1)
700006 (1) ·
700012 (1) ·
700030 (1) ·
700081 (1) ·
700082 (1) ·
700148 (1) ·
790021 (1) ·
790055 (1) ·
790077 (1) ·
790078 (1) ·
790147 (1) ·
790172 (1) ·
794016 (1) ·
795713 (1) ·
796000 (1) ·
880051 (1) ·
884036 (1) ·
884047 (1) ·
930154 (1) ·
930226 (1) ·
930322 (1) ·
935305 (1) ·
935306 (1)
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.4 mi S of Addison Drive' (1) ·
'0.7Mi East of US-1 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'200ft. S of 10th Street ' (1) ·
'33FT E OF CR-611 43RD AVE' (1) ·
'A1A-Port Orange Relief ' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB - Banana River ' (1) ·
'SR-404 WB-Banana River ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-472 over US-17/92 ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 - FECRR ' (1) ·
'US-92 WB-Tomoka River ' (1) ·
'WB SR800.2Mi west of US-1' (1)
26231074 (1) ·
26231130 (1) ·
26262317 (1) ·
26294400 (1) ·
26302557 (1) ·
27335447 (1) ·
27412374 (1) ·
27452066 (1) ·
28043878 (1) ·
28123758 (1) ·
28124312 (1) ·
28124379 (1) ·
28243313 (1) ·
28370979 (1) ·
28582691 (1) ·
29001931 (1) ·
29021928 (1) ·
29083964 (1) ·
29095111 (1) ·
29154558 (1) ·
29154580 (1) ·
29165358 (1) ·
29203187 (1)
80035475 (1) ·
80041209 (1) ·
80041536 (1) ·
80044085 (1) ·
80044341 (1) ·
80252909 (1) ·
80255073 (1) ·
80274529 (1) ·
80360835 (1) ·
80371385 (1) ·
80371403 (1) ·
80374130 (1) ·
80375608 (1) ·
80483851 (1) ·
80542264 (1) ·
80544173 (1) ·
80590233 (1) ·
81051074 (1) ·
81052672 (1) ·
81054109 (1) ·
81070414 (1) ·
81070520 (1) ·
81175636 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 23 results in range #1 to #23.