Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boca Inlet ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Military Trail & CSX RR ' (1) ·
'Palmetto Park Road ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
930006 (1) ·
930060 (1) ·
930154 (1) ·
930187 (1) ·
930188 (1) ·
930197 (1) ·
930198 (1) ·
930199 (1) ·
930202 (1) ·
930226 (1) ·
930245 (1) ·
930246 (1) ·
930247 (1) ·
930248 (1) ·
930251 (1) ·
930319 (1) ·
930325 (1) ·
930401 (1) ·
930414 (1) ·
930415 (1)
'0.25 mi. N of County Line' (1) ·
'0.25 miles S/O SR 794 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'800 ft West of I 95 ' (1) ·
'Boca Raton ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'No. City Line Boca Raton ' (1) ·
'SR 808 / I 95 Interchange' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR-808 at SR-7 Boca Raton' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
107570 (1) ·
15528 (1) ·
17350 (1) ·
177838 (1) ·
19258 (1) ·
300155 (1) ·
40772 (1) ·
53785 (1) ·
67665 (1) ·
78075 (1) ·
82412 (1) ·
96292 (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)