Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'Belvedere Road ' (1) ·
'C-52 Canal ' (1) ·
'CANAL E-2-W(BOYN BC INT)' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'LAKE OSBOURNE ' (1) ·
'LEVEE NO.8 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'MIAMI CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'St Johns River Relief ' (1)
'Becker Rd. ' (1) ·
'CORKSCREW BLVD. ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'I 95 SR 9 ' (1) ·
'JOG ROAD ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR-46 ' (1) ·
'SR-60 EB ' (1) ·
'SR-60 WB ' (1) ·
'SR-714 ' (1) ·
'SR-80 ' (1) ·
'SR-80WB (Southern)' (1) ·
'SR91 SB TPK 87.213' (1) ·
'SW 23RD AVE. ' (1)
790029 (1) ·
880090 (1) ·
880091 (1) ·
890159 (1) ·
930029 (1) ·
930265 (1) ·
930273 (1) ·
930302 (1) ·
930407 (1) ·
930432 (1) ·
930486 (1) ·
934297 (1) ·
934341 (1) ·
934342 (1) ·
934502 (1) ·
937367 (1) ·
941001 (1)
'.2mi East of US-27 ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.2MI S OF US-27 ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'2Mi West of CR-512 ' (1) ·
'2Mi. West of CR-512 ' (1) ·
'6.2 MILES SOUTH OF SR-802' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'SR-46 - St. Johns Riv. R ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)