Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'CANAL ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Crane Creek ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'HALF MILE LAKE ' (1) ·
'Halifax Canal Lateral ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Konomac Canal ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD L-7 CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'Trib to Spruce Creek ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1)
'BARBER STREET ' (1) ·
'Belvede to NB I-95' (1) ·
'Dubber Road ' (1) ·
'Fort Florida Road ' (1) ·
'Jackson Street ' (1) ·
'KELLER ROAD ' (1) ·
'Kings Highway ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'NORFOLK BLVD. ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PINE LAKE ROAD ' (1) ·
'PINETREE LANE ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SE 7TH STREET ' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'STAR ISLAND WAY ' (1) ·
'Tomoka Farms Rd ' (1) ·
'Volco Road ' (1) ·
'WEST LAKE DRIVE ' (1)
705601 (1) ·
794045 (1) ·
794131 (1) ·
794133 (1) ·
794162 (1) ·
796412 (1) ·
885602 (1) ·
894001 (1) ·
894017 (1) ·
894018 (1) ·
894047 (1) ·
930482 (1) ·
930483 (1) ·
930485 (1) ·
930494 (1) ·
930526 (1) ·
935100 (1) ·
936261 (1) ·
936262 (1) ·
936263 (1) ·
936350 (1) ·
940007 (1)
'0.04MI S OF FOREST HILL ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.8Mi S of BRITT ROAD ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'Canal View Blvd Intrsectn' (1) ·
'North of Belvedere Rd ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1)
26375624 (1) ·
26381073 (1) ·
26382116 (1) ·
26391471 (1) ·
26405710 (1) ·
26412225 (1) ·
26412375 (1) ·
26413650 (1) ·
26413700 (1) ·
26504915 (1) ·
27044012 (1) ·
27044356 (1) ·
27090600 (1) ·
27132091 (1) ·
27281242 (1) ·
27455347 (1) ·
28042875 (1) ·
28515436 (1) ·
28543436 (1) ·
28544228 (1) ·
29032507 (1) ·
29081340 (1)
80040300 (1) ·
80040450 (1) ·
80040574 (1) ·
80040575 (1) ·
80041919 (1) ·
80042050 (1) ·
80043055 (1) ·
80043232 (1) ·
80054615 (1) ·
80080433 (1) ·
80080562 (1) ·
80142967 (1) ·
80162552 (1) ·
80235687 (1) ·
80283504 (1) ·
80373635 (1) ·
80393620 (1) ·
80543046 (1) ·
80544759 (1) ·
81002850 (1) ·
81040678 (1) ·
81205307 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)