Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'Brando Canal ' (1) ·
'C-44 Intake Canal ' (1) ·
'C-54 Canal ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'Deer WIldlife Crossing ' (1) ·
'Earman River (C-17) ' (1) ·
'Fellsmere Canal ' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'I-4 ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Lateral B Canal ' (1) ·
'Platt Ranch Access Road ' (1) ·
'Spruce Creek ' (1) ·
'SR-421 ' (1) ·
'SR-507 ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'Yacht Club Cut ' (1) ·
Fellsmere Canal (1)
'13th Street SW ' (1) ·
'Barracuda Blvd. ' (1) ·
'CR726 (Citrus Blv)' (1) ·
'Fifth Street ' (1) ·
'I-4 EB Ramp A ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'Spanish River Blvd' (1) ·
'SR 400 EB ' (1) ·
'SR 400 WB ' (1) ·
'SR A1A ' (1) ·
'SR-507 ' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'St. Johns Heritage' (1) ·
'US-1 (SR-5) ' (1) ·
I-95 SB (1)
700186 (1) ·
700231 (1) ·
700232 (1) ·
700237 (1) ·
700238 (1) ·
704190 (1) ·
790203 (1) ·
790204 (1) ·
790206 (1) ·
790208 (1) ·
790227 (1) ·
790229 (1) ·
790247 (1) ·
795700 (1) ·
795701 (1) ·
884105 (1) ·
890079 (1) ·
894057 (1) ·
930003 (1) ·
930005 (1) ·
930547 (1) ·
930552 (1) ·
940162 (1) ·
940163 (1)
'0.13mi NW from N Causeway' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.2 mi E of SR5 on SRA1A ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.5mi N of SR-68 ' (1) ·
'1.74 Miles E of SR-710 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-4 EB Ramp A to US-92 ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-95 NB over Spruce Creek' (1) ·
'I-95 NB over SR-421 ' (1) ·
'Just North of SR-850 ' (1) ·
'Over Fellsmere Canal ' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'SR 400 - Dear Crossing ' (1) ·
'SR 400 EB - Bear Crossing' (1) ·
'SR 400 EB - Cougar Crossi' (1) ·
'SR-507 over Crane Creek ' (1) ·
Over Fellsmere Canal (1)
26230988 (1) ·
26430558 (1) ·
26483005 (1) ·
26564568 (1) ·
26581931 (1) ·
27012740 (1) ·
27271705 (1) ·
27271802 (1) ·
27344850 (1) ·
27493308 (1) ·
27493323 (1) ·
27493726 (1) ·
27493735 (1) ·
28024500 (1) ·
28040738 (1) ·
29004760 (1) ·
29020655 (1) ·
29043800 (1) ·
29043900 (1) ·
29052700 (1) ·
29060200 (1) ·
29062200 (1) ·
29064300 (1) ·
29081300 (1)
80023637 (1) ·
80032135 (1) ·
80050482 (1) ·
80061969 (1) ·
80104223 (1) ·
80235637 (1) ·
80235639 (1) ·
80255958 (1) ·
80264970 (1) ·
80332834 (1) ·
80332921 (1) ·
80333220 (1) ·
80333306 (1) ·
80371675 (1) ·
80448000 (1) ·
80545465 (1) ·
80545924 (1) ·
81011300 (1) ·
81014200 (1) ·
81070700 (1) ·
81083200 (1) ·
81091400 (1) ·
81103100 (1) ·
81103200 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)