Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CITY OF WPB CANAL ' (1) ·
'CLEAR LAKE ' (1) ·
'EPB - 10 Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD L-2 CANAL ' (1) ·
'M CANAL ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'SWA Retention Canal ' (1) ·
'WPB CANAL C-51 ' (1) ·
'WPB Drainage Canal ' (1) ·
'WPB STUB CANAL ' (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BELVEDERE RD ' (1) ·
'CONGRESS AVE ' (1) ·
'E/B S.R. 704 ' (1) ·
'FLORIDA MANGO RD ' (1) ·
'Haverhill Road ' (1) ·
'I-95 (SR 9) ' (1) ·
'Jog Road ' (1) ·
'KIRK ROAD ' (1) ·
'PALM B LAKE BVD EB' (1) ·
'PALM B LAKE BVD WB' (1) ·
'Riverbend Park Rd ' (1) ·
'Southern Boulevard' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'W/B S.R. 704 ' (1)
930097 (1) ·
930367 (1) ·
930506 (1) ·
930507 (1) ·
930540 (1) ·
934158 (1) ·
934171 (1) ·
934176 (1) ·
934208 (1) ·
934224 (1) ·
934251 (1) ·
934254 (1) ·
934256 (1) ·
934258 (1) ·
934277 (1) ·
934278 (1) ·
934751 (1) ·
937703 (1) ·
937706 (1) ·
937707 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.3 Mi N of 45th St ' (1) ·
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'Between SRA1A&SR80 Cswys.' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 20 results in range #1 to #20.