Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Central Blvd. ' (1) ·
'EB SR 786 ' (1) ·
'EB SR-710 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Investment Lane ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR A1A ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'WB SR 786 ' (1) ·
'WB SR-710 ' (1)
930491 (1) ·
930492 (1) ·
930493 (1) ·
930516 (1) ·
930517 (1) ·
930518 (1) ·
930521 (1) ·
930526 (1) ·
930535 (1) ·
930536 (1) ·
930546 (1) ·
931013 (1) ·
934162 (1) ·
934175 (1)
'0.3 mi east of US 1 & PGA' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.95 MI N of PGA Blvd. ' (1) ·
'1st overpass east of I-95' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'Between SR 710 and 786 ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'Palm Beach Garden Interch' (1)
13500 (1) ·
13716 (1) ·
14600 (1) ·
160500 (1) ·
171500 (1) ·
38250 (1) ·
6000 (1) ·
7400 (1) ·
85750 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10410 (1) ·
12839 (1) ·
148776 (1) ·
20574 (1) ·
23422 (1) ·
25331 (1) ·
278468 (1) ·
297552 (1) ·
66364 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)